The “Integration” tab within the “Workspace Settings” enables you to centrally connect your entire workspace (including all your projects) to your project management tools, communication software, and backend logger.
This means you don’t have to separately connect each BetterBugs.io project with your project tools. You can integrate them all in one go using the workspace-level integration.
Steps to Integrate Your Project Tool at the Workspace Level
Here's how it works:
Getting Started
Login to your BetterBugs.io account and navigate to Workspace Settings > Integration
Select Your Project Tool
Select the tool that you want to integrate (project management, communication, logger) from the tabs below. For instance, let’s connect “Jira” at the workspace level.
Connect
Go to the “Jira” option and hit “Connect”
Authorize BetterBugs.io
Next, hit the “Accept” button down below to authorize BetterBugs.io with your Jira project
This completes the integration and you’re good to go.
All your BetterBugs.io projects within the workspace that you’re currently in, are connected to your Jira tool. Now, you don’t have to connect each project separately with your Jira account.
Excluding Projects from the Workspace Level Integration
You can also exclude a project(s) from the workspace-level integration.
For instance, let’s assume you want to exclude a project from your Jira tool that’s integrated at the workspace level. Here are the steps for it:
Open the Integration Tab from Workspace Settings
In your BetterBugs.io account, open the workspace and navigate to Workspace Settings > Integration
Open the Connected Tool Options
In the Jira (that’s integrated at the workspace level) card, click the three dots (∙∙∙) from the top right
Exclude Projects
Click “Exclude Projects”
Unselect the Project(s) to Exclude
Unselect the project(s) that you want to exclude from the workspace-level integration. Here, let’s unselect “Test Project 3” to prevent connecting it centrally at the workspace level.
Save Preferences
Hit “Continue” and you’re good to go
Now, the project(s) that you unselected would no longer be centrally connected to Jira.
Steps for Removing Workspace Level Integration
The steps to remove the workspace integration are super simple:
Open the Integration Tab
Go to Workspace Settings > Integration
Select the Connected Tool
From below, find the workspace integrated tool that you want to disconnect
Disconnect
Hit “Disconnect” and then “Confirm”
This instantly disconnects the tool from your entire workspace.